Installation of coverings
We employ experienced and trained groups of fitters who ensure professional installation of coverings. Our work is always preceded by a noncommittal and gratuitous visit at the installation place, to take measurements of rooms and to assess important factors which influence our work, such as: condition of old coverings, condition of subfloor, number and type of arches, angles and permanent objects, as well as stairs. We are open to all requests and requirements of our Customers. We are able to do even most unusual installations, like complicated patterns on floors or coverings on walls. We work carefully, efficiently and promptly. We also work in unusual hours, for example after office hours and at weekends. That is why we do not occupy rooms for more time than it is absolutely necessary and our Customers avoid stoppage of work in companies, schools, medial facilities or offices. We have many references concerning finished investments.
Not many people know the complexity of installation of coverings. Covering floor of one small room may include even 65 stages! These are:
I. Preparing subfloor
- Cutting the old covering into stripes
- Tearing the covering off
- Taking the covering out
- Grinding the subfloor from remains of glue and old covering
- Dusting the subfloor
- Priming the subfloor
- Filling in the subfloor
- Mixing levelling compound in proper proportions
- Pouring levelling compound on the subfloor
- Distributing levelling compound with the use of a squeegee
- Venting newly poured levelling compound with the use of a "hedgehog"
- Grinding the subfloor with the use of a grinding machine
- Vacuuming the subfloor with the industrial vacuum cleaner
II. Installing the coverings
- Unwinding the covering from the roll
- Trimming the covering to walls
- Placing one covering on another in order to join them
- Distributing covering glue on a floor
- Spreading coverings to walls
- Distributing covering glue on a floor
- Cutting the covering to make a joint with the use of a ruler
- Pressing the covering at splices
- Rolling and venting the covering
- Vacuuming the covering surface
III. Hot welding PVC covering
- Placing two gores of coverings paraller.
- Milling the covering (making grooves)
- Hot welding the covering - setting the rope in the groove of the joint
- Trimming the rope to the surface level - 2 times
- Cleaning the welding area
IV. Rolling the covering to a wall
- Drawing a guideline of a desired height of base (usually 10 cm)
- Applying glue on the wall
- Pasting the covering on the wall
- Heating the covering with a heater, to make it more flexible
- Rounding the covering to maintain an appropriate angle
- Making trims in the internal and external corners .
- Milling the joints (creating grooves)
- Hot welding the covering - setting the rope in the groove of the joint
- Trimming the rope to the surface level
- Cleaning the welding area
- Cleaning the base from the glue
- Acryling the covering joint with the wall
V. Installing carpet skirting boards
- Placing skirting boards at walls
- Trimming carpet skirting boards
- Making holes in walls
- Placing wall plugs in the holes
- Screwing boards to the wall
- Installing tips and corners at board endings
- Trimming stripes from the covering
- Tearing off the tape protecting glue areas
- Mounting stripes of covering in the board
- Pressing the stripes in the board
- Acryling the joint of the covering and the wall
VI. Installing threshold sills
- Trimming the aluminium threshold sill
- Making holes in the floor
- Placing wall plugs in the holes
- Screwing the threshold sill
VII. Acryling PVC coverings
- Vacuuming and cleaning the subfloor
- Pouring the peeling agent
- Distributing the peeling agent
- Mechanical removal of old protection layers and dirt
- Collecting the peeling agent
- Cleaning the subfloor with water
- Putting the 1st layer
- Putting the 2nd layer
- Putting the 3rd layer
- Hardening the layers by polishing
We have specialist equipment which is necessary when installing coverings (welding heaters, floor grinders or special cutting tools), as well as all accessories (glue, wall and threshold sills, stair profiles, installation glue, smoothing and repair compounds for subfloor and many more). Equipment and accessories that we need to have to start work cost about PLN 30 000. We also need a specially prepared car.